5. In addition to the above will be the cost of the cadastral survey by contract. The Indian rates for the survey of the fields vary according to the size of the fields. The rates per 100 acres paid for 1st class work in Lower Burma vary from Rs.4-12-0 when the fields average 1 acre in size to Rs.10-6-8, when they are about 0.10 of an acre. To these 80% deputation allowance should be added making them Rs.5-11-3 and Rs.12-8-0 respectively. In addition to the actual survey work, there is the inking in of the sheets, the calculation of areas &c., all of which will be Rs.3-8-0 per 1,000 fields or with deputation allowance Rs.4-13-3. Assuming that the fields will be of the smallest dimensions and consequently the work the most expensive, the cost of the cadastral survey, including drawing the sheets and calculating the areas will be as follows:

R. A. P.
Survey work 72,000 x 12-8-0 / 100
Drawing &c. 72,000 x 4-13-3 / 1,000

9,000
348
9,500

6. The total cost of the survey and the supply of fair maps, but not of supplying printed copies by the photo-zinco or other process will be, if the work occupies 1 year, and not including

Edit History

2026-05-31 05:48:20 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
5. In addition to the above will be the cost of the cadastral survey by contract. The Indian rates for the survey of the fields vary according to the size of the fields. The rates per 100 acres paid for 1st class work in Lower Burma vary from Rs.4-12-0 when the fields average 1 acre in size to Rs.10-6-8, when they are about 0.10 of an acre. To these 80% deputation allowance should be added making them Rs.5-11-3 and Rs.12-8-0 respectively. In addition to the actual survey work, there is the inking in of the sheets, the calculation of areas &c., all of which will be Rs.3-8-0 per 1,000 fields or with deputation allowance Rs.4-13-3. Assuming that the fields will be of the smallest dimensions and consequently the work the most expensive, the cost of the cadastral survey, including drawing the sheets and calculating the areas will be as follows: R. A. P. Survey work 72,000 x 12-8-0 / 100 Drawing &c. 72,000 x 4-13-3 / 1,000 9,000 348 9,500 6. The total cost of the survey and the supply of fair maps, but not of supplying printed copies by the photo-zinco or other process will be, if the work occupies 1 year, and not including
Baseline (Original)
.*I ہمو )})} 528 5. In addition to the above will be the cost of the cadastral survey by contract. The Indian rates for the survey of the fields vary according to the size of the fields. The rates per 100 acres paid for 1st. class work in Lower Burma vary from Rs.4-12-0 when the fields average 1 acre in size to Rs.10-6-8, when they are about 0*10 of an acre. To these 80 0/0 deputation allowance should be added making them Rs.5-11-3 and Rs: 12-8-0 respectively. In addition to the actual survey work, there is the inking in of the sheets, the calculation of areas &c.* all of which will be Rs.3-8-0 per 1.000 fields or with .deputation allowance Rs.4-13-3. Assuming that the fields will be of the smallest dimensions and consequently the work the most expensive, the cost of the cadastral survey, including RS. drawing the sheets and calculating the areas will be as follows.. R. A.P. Survey work 72.000 X 18-8-0 - 100 Drawing &c. 78.000 Ri 9.000 4-13-3- 348 sav 9.500 1.000 6. The total cost of the survey and the supply of fair maps, but not of supplying printed copies by the photo-zinco or other process will be, if the work occupies 1 year, and not including
2026-05-31 05:48:20 · Baseline
View content

.*I

ہمو

)})}

528

5. In addition to the above will be the cost of the

cadastral survey by contract. The Indian rates for the survey

of the fields vary according to the size of the fields. The

rates per 100 acres paid for 1st. class work in Lower Burma

vary from Rs.4-12-0 when the fields average 1 acre in size to

Rs.10-6-8, when they are about 0*10 of an acre. To these 80 0/0

deputation allowance should be added making them Rs.5-11-3 and

Rs: 12-8-0 respectively. In addition to the actual survey work,

there is the inking in of the sheets, the calculation of areas

&c.* all of which will be Rs.3-8-0 per 1.000 fields or with

.deputation allowance Rs.4-13-3. Assuming that the fields will

be of the smallest dimensions and consequently the work the

most expensive, the cost of the cadastral survey, including

RS.

drawing the sheets and calculating the areas will be as follows..

R. A.P. Survey work 72.000 X 18-8-0 - 100

Drawing &c. 78.000

Ri 9.000

4-13-3-

348 sav

9.500

1.000

6. The total cost of the survey and the supply of fair

maps, but not of supplying printed copies by the photo-zinco or

other process will be, if the work occupies 1 year, and not

including

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.